Review your assessment
Validate the findings and prepare the advice you want to share.
Critical30-day compound failure · Severe system stress · 14 unknown inputs
Assessment findings
- The scenario reduces indicative available resources to 6,290 MW against 6,800 MW illustrative demand — severe indicative system stress.
- An illustrative 12-hour interruption episode would exceed the 2-hour backup endurance by 10 hours, exposing refrigeration and cold storage.
- Highest potential business impact: refrigeration and cold storage (critical exposure). Illustrative business interruption band E — Severe.
Client investigation and evidence
- Confirm client and site with the client — currently estimated.
- Confirm electricity dependency with the client — currently estimated.
- Confirm backup generator with the client — currently estimated.
- Confirm backup endurance with the client — currently estimated.
- Confirm fuel availability with the client — not yet established.
- Confirm production flexibility with the client — not yet established.
- Confirm transfer to another site with the client — not yet established.
- Confirm business continuity plan with the client — not yet established.
- Confirm alternative arrangements with the client — not yet established.
- Confirm operate without grid with the client — not yet established.
- Confirm electricity supply with the client — not yet established.
- Confirm backup electricity with the client — not yet established.
- Confirm refrigeration and cold storage with the client — not yet established.
- Confirm critical suppliers with the client — not yet established.
- Confirm transport and logistics with the client — not yet established.
- Confirm water supply with the client — not yet established.
- Confirm telecommunications with the client — not yet established.
- Confirm insurance policy wording with the client — not yet established.
Internal broker notes
No internal notes provided.
Insurance review prompts
Policy wording not yet provided; obtain it as a follow-up.
- Business interruption cover: Whether BI is triggered without physical damage at the insured premises.
- Public utilities interruption extensions: Whether the extension requires damage to utility property, and whether transmission vs distribution is covered.
- Contingent business interruption: Named vs unnamed suppliers, tiers covered and applicable sublimits.
- Deterioration of stock: Whether cover requires change in temperature from utility failure, and any maintenance or monitoring warranties.
- Increased cost of working: Economic limit test and any additional ICOW limits.
- Waiting periods and indemnity periods: Waiting period length (e.g. hours) and indemnity period adequacy.
- Limits, sublimits and exclusions: Sublimits, aggregate limits and any exclusions for planned outages, grid instability or cyber causes.
- Relevant policy wording and coverage triggers: Definition of 'damage', 'utility', 'supply undertaking' and causation language.
Assumptions
- All electricity system capacities, demand, imports and interruption episodes are synthetic illustrative assumptions, not public operator data.
- This is a site-specific screening assessment, not a forecast or coverage determination.
- Unknown production flexibility is screened as Medium.
- Unconfirmed critical suppliers is screened as High pending client investigation.
- Financial loss figures are not required; exposure bands are illustrative and are not monetary loss estimates.