Mutual Energy
Critical infrastructure resilience, downstream exposure and financial risk intelligence.
Senior-management demonstration · synthetic scenario and financial values. Not an engineering forecast, actual loss estimate or coverage determination.
30-day compound failure
- Infrastructure assets affected
- Moyle unavailable · 2 generating units unavailable
- Assumed outage duration
- 30 days
- Operating conditions
- Winter peak, low wind
- Available resources
- 6,290 MW vs 6,800 MW demand
What requires management attention
- 01Mutual Energy own risk: Moyle unavailable for 30 days creates an illustrative £11.3m cash-flow sensitivity, separate from downstream losses.
- 02Electricity system: indicative resources are 6,290 MW against 6,800 MW demand, giving severe screening stress; this is not a blackout forecast.
- 03Downstream economy: 20 of 20 fictional businesses have potential exposure under explicit site-interruption assumptions, with £269.7m high-case gross economic exposure.
- 04Portfolio accumulation: 20 exposed insured businesses share island electricity system; aggregated potential insured exposure is £102.0m.
- 05Decision priority: faster restoration reduces duration-driven consequences; insurance or alternative financing addresses residual financial exposure and does not improve physical resilience.
Moyle Interconnector
- Connection
- Scotland–Northern Ireland
- Rated technical capacity
- 500 MW
- Available capacity
- Synthetic scenario placeholder
- Actual electricity flow
- Not observed or modelled
- Future extension
- Gas infrastructure
Conceptual schematic only — not a geographically or electrically accurate network diagram. Moyle links Scotland–NI; East-West and Greenlink link ROI–Wales.
Reduce, retain or finance
Mitigate physical consequences
Restoration improves from 30 days to 7 days in the illustrative option.
Transfer residual financial exposure
Potential transfer £3.30m after mitigation; no physical improvement from insurance.
5 critical or high actions
- Validate Moyle restoration and contractor mobilisation planCritical
Mutual Energy asset management · Not started
30 days is an assumption; engineering evidence must establish credible repair stages and resource requirements.
- Coordinate alternative system resources and contingency arrangementsCritical
Mutual Energy + system operators · In progress
Severe screening stress makes imports, generation, storage and demand response important connected consequences.
- Validate liquidity, revenue and recovery-cost assumptionsHigh
Finance and treasury · Not started
11,250,000 GBP is a synthetic own-risk sensitivity, not a verified financial exposure.
Audience-specific reporting
Executive, engineering and financier reports contain no insured-client identities. The internal broker report is separately labelled.
Generate report