05 · Insurance Considerations

Issues to discuss with your broker

Areas of cover that may be relevant to an electricity infrastructure disruption, with the checks a broker would make and the information needed from the client.

North Coast Foods Ltd · Food processing, refrigeration and cold storage · 30-day compound failure. Policy wording is optional for this first assessment and remains a follow-up.

01

Business interruption cover

Why it may be relevant
Lost gross profit from production stoppage may arise if a trigger is met.
What the broker should check
Whether BI is triggered without physical damage at the insured premises.
Information needed from client
Gross profit, seasonality and maximum indemnity period needs.
02

Public utilities interruption extensions

Why it may be relevant
Interruption originates off-site in the electricity system.
What the broker should check
Whether the extension requires damage to utility property, and whether transmission vs distribution is covered.
Information needed from client
Supply connection details and DNO / supplier information.
03

Contingent business interruption

Why it may be relevant
Suppliers and customers may be affected by the same event.
What the broker should check
Named vs unnamed suppliers, tiers covered and applicable sublimits.
Information needed from client
Critical supplier and customer list with dependency share.
04

Deterioration of stock

Why it may be relevant
Refrigerated stock may deteriorate if cooling is lost.
What the broker should check
Whether cover requires change in temperature from utility failure, and any maintenance or monitoring warranties.
Information needed from client
Stock values, refrigeration maintenance records, alarm systems.
05

Increased cost of working

Why it may be relevant
Hiring generators, overtime or alternative storage may reduce loss.
What the broker should check
Economic limit test and any additional ICOW limits.
Information needed from client
Contingency costs anticipated and available alternatives.
06

Waiting periods and indemnity periods

Why it may be relevant
Short interruptions may fall within a time excess.
What the broker should check
Waiting period length (e.g. hours) and indemnity period adequacy.
Information needed from client
Typical recovery times and customer contract lead times.
07

Limits, sublimits and exclusions

Why it may be relevant
Utility-related extensions are often sublimited.
What the broker should check
Sublimits, aggregate limits and any exclusions for planned outages, grid instability or cyber causes.
Information needed from client
Estimated values at risk to compare with limits.
08

Relevant policy wording and coverage triggers

Why it may be relevant
Coverage depends on precise trigger definitions.
What the broker should check
Definition of 'damage', 'utility', 'supply undertaking' and causation language.
Information needed from client
Copies of current policy schedules and wordings.